Corporate Solutions  ·  Solutions  ·  Tender & Proposal Solutions
Tender & Proposal Solutions  ·  Service line 03

Bids are scored on your people before anyone opens your price

In a functionality or technical evaluation, your key personnel are points. A panel works through qualifications, professional registration, years of relevant experience and comparable project work against a published rubric, and a submission that falls short of the threshold is set aside before the price envelope is considered. We write and standardise the personnel documentation that carries those points.

Written by a professional To the prescribed bid format NDA on request
Since 2017
Nine years of practice
38 countries
Across five continents
Who It Is For

For the people who own the submission

Bid managers and business development leads carry a deadline that does not move and a document set that is never quite ready. The technical response gets the attention. The personnel section, which is scored, gets whatever time is left.

Bid and proposal managers

Running a submission with a fixed closing date, chasing CVs from people who are billing on site and formatting them at midnight. This is the part of the bid that can be prepared properly in advance.

Consulting, engineering and ICT firms

Firms whose credibility rests on named experts, bidding into public sector, donor-funded and private frameworks where personnel documentation is evaluated rather than skimmed.

Joint ventures and consortium leads

Partners bringing CVs from three organisations in three formats into one submission that has to read as though it came from one firm.

How It Is Actually Scored

The personnel section is a marked paper

Most CVs written for a bid are written as though a client will read them. An evaluator is not a client. They are working through a scoresheet, under time pressure, looking for specific evidence in a specific place, and awarding or withholding points accordingly.

i

The rubric is published, and most bidders skim it

The evaluation criteria sit in the bid document: what is scored, what each element is worth, and the minimum required to proceed. A personnel CV should be written against that table, criterion by criterion, not against a general idea of what a good CV looks like.

ii

Points are lost on verification, not on talent

Professional registration numbers missing or expired. Dates that do not reconcile across a team. A qualification stated without the awarding institution. Project experience described in language that never touches the scope of work. Each of these is a scored line an evaluator cannot award.

iii

Threshold before price

Under the Preferential Procurement Policy Framework Act, functionality is commonly evaluated first, with a minimum threshold, and only qualifying bids proceed to price and preference points. A strong price behind a weak personnel section is never opened.

iv

Consistency reads as capability

Five CVs in five layouts, with five ways of describing the same project the firm delivered together, tells an evaluator something about the organisation submitting them. One standard, applied across the team, is the cheapest credibility available in a bid.

A note on the changing rules. The Public Procurement Act 28 of 2024 was assented to in July 2024 but has not yet commenced, so the PPPFA framework still governs. Draft regulations published for public comment in 2026 would move evaluation to a threshold model, with minimum scores on capability and capacity, functionality and technical requirements, and preference, each assessed before price. The Act also faced a constitutional challenge argued in the Constitutional Court in May 2026. The direction of travel is clear enough to plan for: personnel evidence is becoming more decisive, not less. We track this and write to the framework that applies on your closing date.
What You Receive

Five document types, one standard

i

Key personnel CVs

Written to the format the bid document prescribes, whether that is a client template, a donor form or a free format, and structured so an evaluator finds each scored element where they expect it. Qualifications, registrations, years of relevant experience and comparable projects, each stated so it can be verified.

Client templatesDonor and multilateral formsFree format
ii

Consultant and specialist profiles

Shorter credential pieces for named experts, associates and subcontracted specialists, written to sit alongside the personnel CVs without repeating them and without contradicting them.

Named expertsAssociatesSubcontracted specialists
iii

Project experience profiles

Your track record written as evidence rather than as a list: scope, role, value band, duration, outcome and the specific relevance to the work being tendered for, mapped to the terms of reference.

Terms of reference mappingReference-readyReusable across bids
iv

Standardisation and capability documentation

One template, one style and one set of conventions applied across the whole bid team, plus the company capability statement or corporate profile where the submission calls for it. You keep the master set and reuse it on the next bid.

House templateMaster reusable setCapability statement
What To Expect

From bid document to submission-ready set

01

Send the brief

Share the bid document or terms of reference, the personnel list and whatever CVs exist. A consultant reads the evaluation criteria before quoting.

02

Scope and quote

You receive a scope, a fixed quote and a delivery schedule built backwards from your closing date. Nothing begins until you approve it.

03

Intake and writing

A short structured intake per person, so your experts spend minutes rather than evenings. Writing follows, to the prescribed format and against the scored criteria.

04

Delivery and reuse

Editable Word and PDF, plus the master set in your house template. The next submission starts from a library rather than from an inbox.

“

Start with a pre-submission audit

If a bid is close to closing and the personnel section already exists, the fastest engagement is an audit rather than a rewrite. A consultant reads your CVs against the published evaluation criteria and returns a marked list of where points are at risk and what to fix first. Firms usually run this once, then bring the next submission to us earlier.

Request a Proposal

Tell us the brief, and we will scope it

Send the bid document, the personnel list and your closing date. A consultant reads the evaluation criteria and returns a scope, a fixed quote and a schedule that works backwards from the deadline.

If you can attach or send through the bid document, the quote comes back sharper and faster.
A consultant responds within one business day, Monday to Friday, 08:00 to 17:00 SAST.

Short-notice submissions

A closing date this week is not automatically a problem, but it does change the scope. Say so in the brief and a consultant will tell you plainly what is achievable in the time and what is not, before you commit to anything.

Every corporate engagement is scoped and quoted before any work begins. Nothing is charged until the scope is agreed in writing. An NDA is available on request, and is signed before material is shared where you prefer it that way.
Considered Questions

Before you enquire

Can you write to the format prescribed in the bid document?
Yes, and it is the default. Where the client, department or funder prescribes a CV template or form, we write into it exactly. Where the format is free, we use a house structure built around the evaluation criteria in that specific document.
We close this week. Can you still help?
Sometimes. Short-notice submissions are scoped differently and often start as a pre-submission audit of what you already have rather than a full rewrite. A consultant will tell you candidly what is achievable in the time before you commit to anything.
Do you write the technical proposal itself?
No. Our scope is the personnel and capability documentation: key personnel CVs, consultant and specialist profiles, project experience profiles and the capability statement or company profile. The methodology, work plan and technical response stay with your team, who know the work.
What about donor and multilateral formats?
Those are core work. Development finance institutions and multilateral funders generally prescribe a standard CV form for key experts, and submissions are regularly marked down or rejected on format compliance alone. We write into the prescribed form and check it against the instructions before it goes back to you.
Some of our key personnel sit at partner firms. Does that complicate it?
It is common on joint ventures and consortium bids, and it is exactly where standardisation earns its fee. We work with CVs from every partner and bring them into one format and one voice, with each partner reviewing and approving their own people’s documents.
Will you sign an NDA?
Yes, on request, and before any material is shared where you prefer it that way. Bid content is commercially sensitive and is treated as such. We never disclose who we work for or what we have worked on.
How is this quoted?
Per submission, on volume, format complexity and deadline. You receive a fixed quote and a delivery schedule before anything begins, invoiced off-platform on your terms. There is no price list because no two bids are the same shape.
Related Service Line

Bidding often, not just once? Build the profile library first

Firms that bid regularly stop rewriting the same experts every quarter. Consultant & Specialist Profiles builds a maintained set of profiles in your house template, in short, medium and long versions, so the next submission is assembled rather than written.

By consultation
Scoped as one engagement
Consultant & Specialist Profiles
Need the company-level documents as well? See Corporate Branding for capability statements, supplier profiles and company profiles.
Tender & Proposal Solutions · scoped & quoted per submission

The technical response wins the argument. The personnel section gets you heard.

Written to the prescribed format · standardised across the bid team · completely confidential
Supporting an individual leader rather than an organisation? Executive Solutions.